Sustaining Capital Infrastructure

(06)

Overview

Procurement Management | Risk Management | Lean Project Management | Environmental Management Strategic Planning, Design and Procurement Support Project Management of Infrastructure Upgrades Full time (7 days per week) on site project/contractor surveillance Supporting the Capial Projects team at the new Cleermont Coal Mine in Central Queensland. Delivering an integrated environmental and engineering strategy for the decommissioning and closure of large scale industrial mining assets

Project Budget

$200M+

Year

2011 - 2014

Customer

Rio Tinto Clermont Coal

UMINEX sustaining capital infrastructure project showing an aerial view of a large open-cut mining operation with terraced excavation, haul roads, and active heavy mining equipment
UMINEX sustaining capital infrastructure project showing an aerial view of a large open-cut mining operation with terraced excavation, haul roads, and active heavy mining equipment

Challenge

Managing the intersection of operational requirements and complex engineering compliance during the transition from initiation to fully operational status and ongoing maintenance.

UMINEX delivering sustaining capital infrastructure works with heavy machinery installing large-diameter pipelines during earthworks at an operational mining site
UMINEX delivering sustaining capital infrastructure works with heavy machinery installing large-diameter pipelines during earthworks at an operational mining site
UMINEX site supervisor overseeing sustaining capital infrastructure works at a large mining excavation, with active earthworks and operational plant in the background
UMINEX site supervisor overseeing sustaining capital infrastructure works at a large mining excavation, with active earthworks and operational plant in the background

Impact

Supporting the rapid growth of the new minesite while ramping up production

UMINEX managing sustaining capital mining infrastructure as a dump truck discharges excavated material into a reinforced industrial structure on site
UMINEX managing sustaining capital mining infrastructure as a dump truck discharges excavated material into a reinforced industrial structure on site