Advanced Water Recycling Scheme

(09)

Overview

Procurement Management   |  Risk Management   |   Lean Project Management   |   Environmental Management   Procurement Support, Engagement, Mobilisation of John Holland Group as Principal Contractor for AWRF Full-time (7 days per week) on-site project / principal contractor surveillance. Responsible for development and governance of Site Safety, Construction Management, and Quality Management plans Financial Management and Reporting Grant Funding support 1st Phase – construction of Advanced Water Recycling Facility Support with Detailed Design for Ring Main for Public Open Space Irrigation Stakeholder Consultation Recycled Water Management Plan & Section 60 Approval Process

Project Budget

$19M with $9.3M Grant Funding

Year

2017 - 2019

Customer

Parkes Shire Council

UMINEX aerial view of advanced water recycling scheme construction site with crane, earthworks and tanks.
UMINEX aerial view of advanced water recycling scheme construction site with crane, earthworks and tanks.

Challenge

Recycling Pipework had to be constructed through town.

UMINEX  floating treatment equipment on recycled water pond at advanced water recycling facility
UMINEX  floating treatment equipment on recycled water pond at advanced water recycling facility
UMINEX  excavator and field crew installing recycling pipework through bushland corridor
UMINEX  excavator and field crew installing recycling pipework through bushland corridor

Impact

Parkes now has a fully established water recycling scheme which allows sportsgrounds and schools to be irrigated in drought.

UMINEX  wide earthworks view of water infrastructure site with two inspectors on graded pad.
UMINEX  wide earthworks view of water infrastructure site with two inspectors on graded pad.